Industrial-grade
autonomous labour,
ready to deploy
Autonomous vision-guided picking cells, heavy AMR fleets, and turnkey modular containerized NVIDIA B300 data centres operating at human speed with zero downtime. Built for companies across the European Union.
USED BY & BUILT WITH


Commercial Physical AI & Turnkey Compute Infrastructure
Warehouse robotics, turnkey container pods, and liquid-cooled NVIDIA B300 datacenters delivering verified ROI from day one.
PROVEN IN THE FIELD
Siemens and KOTA Orbit bring Physical AI to Industrial Campuses: Turnkey NVIDIA B300 Infrastructure
KOTA Orbit Alpha Goes to Work: Manufacturing Logistics POC Completed with SAP and Automotive Partners
MODULAR AI INFRASTRUCTURE
Turnkey Modular AI Container Datacenters
Pre-engineered 20ft and 40ft containerized pods with liquid-cooled NVIDIA B300 servers. Deployable globally in weeks.

40ft AI Container Pod
Turnkey heavy-gauge steel modular pod with weatherized external dry coolers and CDUs. Matte black industrial finish with KOTA ORBIT precision branding.
18 Racks / 40ft Pod
Up to 2.4 MW compute capacity per container with high-density busways.
- 20ft (8 Racks, ~1.0 MW) & 40ft (18 Racks, 2.4 MW)
- Up to 135 kW per server rack
- Integrated busway & clean-agent fire suppression
Closed-Loop DLC
Direct-to-chip stainless manifold with external dry coolers. PUE 1.12.
- 35°C warm-water supply (100% free cooling)
- PUE 1.12 annual average
- N+1 redundancy on internal CDUs
Plug & Play Factory
Stackable container pods creating 10 MW to 50+ MW AI factories on demand.
- 4 to 8 weeks global delivery & hookup
- Avoids 24 to 36 month traditional civil delays
- Built to EU standards (CE, EN 50600)
KOTA ORBIT Modular Datacenter Engineering
KOTA Orbit plans and delivers modular container datacenters for companies in the European Union. From single 20ft edge pods to multi-megawatt campus grids, every unit is pre-assembled, factory-tested with NVIDIA B300 servers and delivered turnkey to EU standards.
SUBSEA COMPUTE INFRASTRUCTURE
Subsea AI Pods: Hyperscale Compute on the Ocean Floor
Hermetically sealed underwater pressure capsules utilizing ambient deep-ocean cooling and an inert dry nitrogen atmosphere. Delivering PUE 1.05 and 8x higher hardware reliability.

Seabed Pod Architecture
Hermetically sealed underwater pressure capsule resting on the continental shelf. Surrounded by natural 4°C to 12°C seawater for continuous, chiller-free convective cooling.
Direct titanium marine heat exchangers dissipate 100% of GPU thermal load into ambient seawater without chillers or cooling towers.
Zero freshwater consumed. Eliminates the millions of liters of potable water lost annually to evaporative cooling on land.
Hermetic dry Nitrogen (N2) atmosphere with zero oxygen or moisture prevents copper corrosion and thermal solder fatigue.
Direct connection to offshore wind turbines and tidal arrays via armored umbilical power cables, achieving true net-zero compute.
Engineering Comparison: Subsea Pods vs. Terrestrial Datacenters
| Architecture Parameter | KOTA ORBIT Subsea Pod | Traditional Hyperscale Facility |
|---|---|---|
| Power Usage Effectiveness (PUE) | 1.05 to 1.07 | 1.35 to 1.60 |
| Water Consumption (WUE) | 0.00 L / kWh (Zero Potable Water) | 1.80 L / kWh (Evaporative Towers) |
| Atmosphere & Environment | Dry Nitrogen (N2), 0% Oxygen, 0% Humidity | Ambient Air, Oxygen, Dust, Humidity |
| Server Component MTBF (Failure Rate) | 8x Lower Component Failure | Standard Baseline Failure Rate |
| Deployment Timeline | < 90 Days Marine Turnkey | 24 to 36 Months Civil Construction |
| Land Acquisition & Zoning | 0 m² Real Estate Footprint | High Coastal Land Costs & Permits |
Turn Your Land & Power Into Millions in Recurring AI Compute Cash Flow.
KOTA Orbit designs, builds, and operates turnkey modular NVIDIA B300 datacenters on your site, and guarantees 100% compute off-take through our pre-leased network of global AI research labs and enterprise tenants.
5 MW Turnkey AI Infrastructure
Direct net cash flow after power, PUE cooling & operations.
Contractual monthly tenant lease distributions.
Based on multi-year enterprise GPU off-take contracts.
Total market value of generated Blackwell compute capacity.
How KOTA Orbit Delivers & Fills Your AI Datacenter
Site & Power Grid Audit (Days 0 to 30)
We evaluate your medium/high-voltage power connection, transformer capacity, or renewable PPA potential.
Turnkey Pod Build & Deployment (Days 30 to 90)
We deliver pre-fabricated, direct-liquid-cooled B300 container pods and commission Tier-IV cooling loops.
100% Pre-Leased Tenant Placement
KOTA Orbit fills compute capacity with multi-year wholesale leases from sovereign AI labs and enterprise tenants.
Monthly Recurring Net Cash Flow
You receive contractual monthly revenue disbursements directly to your treasury while we handle 24/7 operations.
CORE PRODUCT
Meet KOTA Orbit Alpha, an industrial automation system built for warehouse intralogistics and hyperscale AI workloads.
Handles heavy pallets via AMRs and up to 35 kg articulating picks with millimeter precision.
Picks per hour with 99.98% zero-shot optical identification and placement certainty.
Proprietary AI physical model stack accelerated by Blackwell Ultra liquid-cooled compute.
Stainless steel closed liquid cooling loops dissipating > 90% heat without mechanical chillers.
The muscle, technology and power ready to work.
View complete specsRECENT PRESS & RECOGNITION
Inside KOTA Orbit: The Multi-Megawatt AI Datacenter Pipeline and Autonomous Warehouse Fleet Rollout
How Industrial Heavyweights Are Replacing Manual Warehouse Sorting with Physical AI Robotics
NVIDIA B300 Infrastructure Agreements Signed for Turnkey Direct Liquid Cooling Campus
COMMERCIAL DEPLOYMENT
Ready to deploy autonomous labour & compute?
Reserve B300 modular container pods, datacenter white space or schedule on-site picking robotics pilot trials in your facility.

